Project Planning: Design, Installation, Foundation Plan
Project Management
When planning and setting up CNG systems, BAUER is your competent partner. We plan and realise the CNG fuel station from the design up to the turn-key handing - over (excluding any construction authorisation which may be necessary) through close co-operation with the clients.
When designing a CNG station the important parameters are the number of vehicles to be filled, the size of the vehicle tank and the refuelling peaks. In accordance with the customer‘s specifications we will gladly draw up a corresponding optimised design and concept of the natural gas fuel station (fuelling profiles, extendibility etc).
Together with the client a design of the CNG fuel station is drawn up focussing on safety and economics. The ex-proof protection zones, customer-friendly positioning of the fill post, sound emission of the compressor system as well as an optimised high pressure tubing layout between the compressor tank unit & fill post are important parameters.
After establishing the placement of the system, our team of engineers will draw up an installation and foundation plan as part of the order processing, in particular stating the interfaces for the operation of the system in detail such as the building dimensions, gas input piping, power supply, pneumatic and electrical connection lines to the fill post and the station shop.
|